What We Do

Services

The full list of concrete and masonry work we handle, start to finish.

Home › Services

Everything we take on

Every job below is one we do ourselves across Cincinnati.

Concrete Driveways

We excavate, grade, and compact a gravel base before any concrete goes down, since a driveway that cracks in year two almost always failed underneath first. Standard thickness runs 4 inches for a car, closer to 6 for anything heavier, with rebar tied in rather than wire mesh. Give it a week before you park a car on it and a full 28 days before anything heavy.

Concrete Patios

A patio slab gets a broom finish for grip or a stamped pattern if you want the look of flagstone. We pitch it away from the house, about a quarter inch per foot, so water doesn't pool against your foundation. Most patios cure enough for furniture within a few days, though full strength takes about a month.

Stamped Concrete

Stamped concrete gets color added to the mix or broadcast on top, then textured with mats before it sets up, so it reads as slate, brick, or wood without the joints where weeds take hold. It needs a sealer every few years to keep the color from fading in direct sun. We walk you through pattern and color options before we ever mix a batch.

Concrete Walkways & Sidewalks

Walkways get the same base prep as a driveway, just narrower, usually 3 to 4 feet wide and 4 inches thick. We match the slope to existing grade so water runs off the path instead of toward your door. Control joints go in every 4 to 5 feet to keep any cracking tight and straight.

Concrete Steps & Porches

Steps take more layout work than flatwork since the rise and run has to match code and still feel right under your foot. We form each riser separately and vibrate the concrete to knock the air bubbles out before it sets. A cracked or spalling porch slab usually means water got under it years ago, and we address that before we pour new concrete on top.

Concrete Slab Foundations

A slab foundation needs a vapor barrier under it in this climate, or moisture works its way up through the concrete over time. We check soil compaction before the pour, not just the finish grade, since that's what actually holds a foundation flat. Rebar or post-tension cable goes in depending on the span and the engineer's call.

Concrete Repair & Crack Injection

Hairline cracks get an epoxy or polyurethane injection so water stops getting underneath and making the problem worse. Bigger structural cracks, the kind where one side sits higher than the other, usually mean cutting out that section and re-pouring it. We'll tell you straight if a patch will hold or if you're better off replacing the slab.

Concrete Resurfacing & Leveling

If a slab is still solid but the surface is pitted, scaling, or just ugly, a resurfacing overlay can fix the look without a full tear-out. Slabjacking or polyurethane foam lifts a sunken section back to level by filling the void underneath instead of re-pouring it. Resurfacing only works on concrete that isn't cracked all the way through, so we check that before recommending it.

Retaining Walls

A retaining wall over about 3 feet needs drainage behind it, usually gravel backfill and a perforated pipe, or the wall ends up fighting water pressure it was never built for. We set footings below the frost line so the wall doesn't heave in winter. Block, poured concrete, or stone veneer all work, depending on the look and what the slope is doing.

Brick & Block Masonry Repair

Mortar joints break down faster than the brick around them, so repointing, cutting out old mortar and packing in new, usually fixes a wall or chimney before the brick itself is damaged. We match mortar color and joint style so the repair doesn't stand out against the original work. Left alone too long, failed mortar lets water in, and that's what actually cracks the brick.

How It Works

Four steps, and no surprises in any of them.

01

We come and look

You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.

02

You get a price

In writing, itemised, free. If something might add cost later we flag it now rather than at the end.

03

We do the work

Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.

04

We walk it with you

You point out anything you are not happy with and we fix it before the invoice, not after.

Where We Work

All of this, across Cincinnati, OH

Site visits and quotes cover Cincinnati and the towns within about fifty miles.

Cincinnati, OH
Hamilton, OH
West Chester, OH
Covington, OH
Middletown, OH
Fairfield, OH
Mason, OH
Florence, OH
Lebanon, OH
Norwood, OH
Loveland, OH
Milford, OH
Common Questions

Things worth asking

Questions that come up once a concrete project is actually underway.

Do I need a permit for a new driveway or patio?
Most municipalities require a permit for a new driveway, especially where it meets a public street or right-of-way, while a simple patio replacement often doesn't need one. Permit requirements vary by city and township, so checking with the local building department before work starts avoids a stop-work order mid-project.
How long does a typical concrete pour take?
Forming, pouring, and finishing a standard driveway usually takes one to two days, with the concrete needing about a week before it can handle a parked car and a full 28 days to reach design strength. Larger patios or jobs with decorative stamping can take a few days longer.
Can concrete work be done on a tighter budget?
Concrete costs scale with square footage, thickness, and finish, so reducing the footprint, choosing a plain broom finish instead of stamping, or phasing a large project are all ways to bring the price down. A contractor should lay out those tradeoffs plainly in the quote rather than cutting corners on the base or the steel to hit a number.
Is there a guarantee on concrete work?
Reputable concrete contractors warranty workmanship against defects like improper curing or settling tied to poor site prep, typically for one to a few years, though normal weathering and minor surface cracking at control joints is expected behavior, not a defect. What's covered should be spelled out in writing before the job starts.
Who will I actually be dealing with during the job?
On most concrete jobs, the person who gave the estimate is the same one running the crew on site, which matters because they already know the drainage issues and soil conditions from the walkthrough. Asking upfront whether the estimator and the crew lead are the same person is a fair question.
What kind of concrete mix and reinforcement gets used?
Standard residential concrete runs a 3,500 to 4,000 psi mix, reinforced with rebar on driveways and anywhere vehicles sit, or wire mesh on lighter-duty walkways and patios. Air-entrained mix is standard in this climate since it resists the freeze-thaw cracking that plain concrete is prone to.
Can I stay in my house during a concrete project?
Living in the house during a driveway or patio pour is normal, since the work happens outside and doesn't affect utilities or interior access. The main disruption is a blocked driveway for a few days while the new concrete cures enough to drive on.
How should I prepare the site before work starts?
Clearing cars, patio furniture, and landscaping from the work area beforehand speeds up the job, and marking buried sprinkler lines or low-voltage wiring helps avoid damage during excavation. Calling 811 to have utility lines located is standard practice before any digging begins.
What happens if a problem turns up once the old concrete is removed?
Demo sometimes uncovers a bad base, an old tree root, or standing water that wasn't visible before the slab came out, and all of those need fixing before new concrete goes down. A straightforward contractor explains the issue and the added cost before pouring over it rather than after.
How do I take care of new concrete once it's finished?
New concrete needs to cure undisturbed for about a week before vehicle traffic and a full 28 days before it's at full strength, and sealing every two to three years helps it resist salt and freeze-thaw damage. Avoiding rock salt directly on new concrete its first winter prevents pitting before the slab has fully cured.

Not sure what you need?

Describe the problem and we will tell you what it probably is. No obligation.

Call (513) 450-8206